This project includes major utility relocates, widening of each intersection, installation of water main and storm drain systems, dual left turn lanes in each direction, raised medians, mill and AC overlay of existing roadway (500’ for each leg) traffic control and street light upgrades, and new landscaping throughout.
LocationPeoria, AZOwnerArizona Department of Transportation (ADOT)DesignerParson Transportation Group