This project includes the 82,000 SF build-out of an existing data center floor. Project scope includes full height walls, high access flooring throughout, chilled distribution system and rooftop chiller units, CRAH cooling units, DH mission critical electrical distribution system, generators, and electrical POD units.
LocationChandler, AZOwnerConfidential