This project includes intersection improvements and widening with new sidewalks, landscaping, extensive business coordination, stamped paving, traffic signals, street lights, grading, and drainage. The Haydon team worked closely with the Town and adjacent businesses to create a construction phasing plan that mitigated ingress/egress impacts. Through the use of water barricades our team was able to preserve the existing lane configurations during construction.
LocationGilbert, AZOwnerTown of GilbertDesignerEPS Group, Inc.